The track has now been fixed and ballasted using PVA glue.
I don't have any set plans for the layout so you are as wise as me how it will end up.
This is an update of the progress made so far.
23/02/2015
Preparation for three tunnels:
26/02/2015
The ballasting needs tidying up, but I will do that as I develop the layout, the paint on the board is only an undercoat.
In this picture you can see the power cables from below the board.
06/03/2015
Making the curved tunnel with balsa wood:
10/03/2015
14/03/2015
17/03/2015
I am now ready to sort out the back, with paint and scatter etc.
Buffers at the end of the lines and level crossing gates will be added later.